Career

JOB TITLE : QUALITY CONTROL ENGINEER

JOB DESCRIPTION– QUALITY CONTROL ENGINEER

  • THIS POSITION WILL BE PART OF THE EXECUTION TEAM OF CMPL, CONCEPTUALIZE/IMPLEMENTATION OF SYSTEMS, POLICIES, PROCEDURES, ABILITY TO PROVIDE DIRECTION TO THE CONSTRUCTION SITES, AWARENESS OF REGIONAL COMPLIANCE, WILLINGNESS TO TRAVEL INTERNATIONALLY
  • TO MANAGE MULTIPLE PROJECTS (TO START WITH ONE) AS WELL AS MANUFACTURING PLANT AND MANAGE A TEAM.

JOB RESPONSIBILITIES – QUALITY

  • TO INSTITUTIONALIZE QUALITY PRACTICES TO BRING INCREMENTAL IMPROVEMENTS AT VARIOUS STAGES OF PROJECT EXECUTION AND MANUFACTURING.
  • TO WORK CLOSELY WITH MANAGER – QUALITY & EHS ON DAY TO DAY ACTIVITIES
  • TO CONDUCT QUALITY MEETINGS, INTERNAL AUDITS AS PER ISO NORMS FOR THE UNIT IN ASSOCIATION WITH MANAGER QUALITY &
  • CO-ORDINATE TESTING ACTIVITIES: INTERNAL TESTS AND CUSTOMER
  • IDENTIFY AND ANALYZE CAUSES FOR FAILURE AT THE MANUFACTURING STAGE; RECOMMEND PREVENTIVE/ REMEDIAL ACTION
  • COORDINATE WITH PROJECT MANAGEMENT TEAM WITH PRE-CONSTRUCTION, PRE-PHASE AND PRE-TASK PLANNING AND IMPLEMENTATION OF THE SITE PROJECT QUALITY
  • ASCERTAIN QUALIFIED 3RD PARTY INSPECTION BODY FOR SERVICES REQUIRED RENDERED FOR WELDING, CRANE, VALVES, BOILERS INSPECTION SERVICES.
  • CONTROL NONCONFORMING WORK ACTIVITIES USE THROUGH THE IMPLEMENTATION OF THE ISO 9001, QUALITY CONTROL PROGRAM (QCP) NONCONFORMANCE CONTROL PROCEDURES AND AS PER APPLICABLE CODES AND REQUIREMENTS FOR ALL PROJECT SITE
  • VERIFICATION OF RECEIVING INSPECTION REPORTS, NON-CONFORMANCE REPORTS, AND TRANSFER OF OWNERSHIP FOR COMPLIANCE TO PROJECT
  • IDENTIFY, AND REPORT MATERIAL, PROCESS OR PART
  • WORK WITH SUPPLY MANAGEMENT AND MANUFACTURING GROUPS TO ASSURE ACCURATE AND TIMELY DISPOSITION OF ALL INCOMING MATERIAL.
  • COLLECT, COMPILE AND REPORT ON CONSTRUCTION AND FABRICATION PROCESS PERFORMANCE AND PRODUCT
  • MONITOR AND/OR MAINTAIN AND CONTROL INSPECTION OF ANY TOOLS AND FIXTURES AS
  • TO PROMOTE AND CONDUCT DEPLOYMENT OF QUALITY TOOLS IN ORDER TO SOLVE PROBLEMS, REDUCE THE COST OF NON QUALITY AND IMPROVE THE OVERALL EFFICIENCY OF THE UNIT
  • WORK WITH CONTRACTORS AND AUTHORIZED INSPECTION BODY, FOR BOILERS AND PRESSURE VESSELS, DETERMINING ITP, HOLD POINTS, AND DOCUMENTATION REQUIREMENTS ACCORDING TO IBR, ASME, AND AWS PRIOR TO
  • MAINTAIN PROJECT SITE QUALITY JOB FILE AND MANUFACTURER’S DATA
  • COORDINATE INSPECTIONS WITH LOCAL OFFICIALS, THIRD PARTY INSPECTION COMPANIES, AND OTHER THIRD PARTY CODE JURISDICTION AGENCIES AS REQUIRED FOR PROJECT / PRODUCT REQUIREMENTS.
  • IN ACCORDANCE WITH THE PROJECT QUALITY SYSTEM, LIAISE WITH THE CUSTOMERS TO ENSURE THAT ALL SYSTEMS MEET THE NEEDS AND APPROVAL OF THE CUSTOMER AND ALSO COMPLY WITH CMPL QUALITY ASSURANCE POLICIES.

EDUCATION / EXPERIENCE REQUIREMENTS

  • MINIMUM 7+ YEAR’S RELEVANT EXPERIENCE IN QUALITY FUNCTION IN POWER
  • NDT LEVEL -2 – ( VT,MPT,DPT, RT AND UT )
  • KNOWLEDGE IN WPS / PQR / WQT
  • ISO 9001;2015 – INTERNAL AUDITOR PREFERABLE.
  • IMPLEMENTING AND MAINTAINING QMS DOCUMENTATION IN ACCORDANCE WITH ISO STANDARD REQUIREMENTS, CONDUCTING INTERNAL AUDITS, IMPARTING TRAINING TO IMPROVE AUDIT SKILLS. EXPERIENCE OF WORKING ON EPC PROJECTS IS AN ADDED ADVANTAGE

SKILL / COMPETENCY

  • EFFECTIVE TIME MANAGEMENT SKILLS AND ABILITY TO
  • THE ABILITY TO MANAGE CONFLICTS, RESOLVE DIFFERENCES AND TEAM WORK IN A GLOBALIZED
  • A PROVEN ABILITY TO WORK ON CHALLENGING AND TIME-CONSTRAINED
  • A SELF-STARTER WHO CAN THRIVE IN A DYNAMIC TEAM
  • SOUND WRITTEN AND VERBAL COMMUNICATION IN ENGLISH AND INTERNAL CUSTOMER RELATIONSHIP

LOCATION: CHENNAI 

CONTACT: E-MAIL THE RESUME TO MR. ARUNKUMAR, ARUNKUMAR.SUBRAMANIAN@CNIMMARTIN.IN

Apply Now

1
reCaptcha v3
keyboard_arrow_leftPrevious
Nextkeyboard_arrow_right
FormCraft - WordPress form builder

 

Start typing and press Enter to search